Installation of power supply to Broadgreen Hospital
Installation of power to CT Scanner
Power to New CT Scanner- Broadgreen Hospital

This was the third floor of a large corporation. The project was to turn this to turn this into an archive room.
Fearns Wharf - Leeds - Before

We firstly cleared the room and installed a new steel flooring system and installed deck boxes
Archive Room Flooring

This was a newly formed room which require the lights to be reconfigured and a new wall and doorway to be formed.
Installation of stud wall to form Archive Room

The archive room complete showing new flooring, lighting, doorway and decorations
Fearns Wharf - After

We carried out the outside decorations for this beautiful building. The project was scheduled from April - June was on time and budget.
Dohle Fort Ann

This depot also served as the only place outside workers could dry off and eat. We wanted to give them a more welcoming space.
Grove Road Kitchen - Before

A much more welcoming place to prepare and eat lunch for staff.
Grove Road Kitchen - After

A space at the end of the kitchen to eat and a nice warm place to dry off after being outdoors all day.
Grove Road Kitchen - After

This required a full refurbishment, it was very dark, tired and staff felt cramped and unproductive.
Grove Road Office Before

Newly Installed Fire Exit
Grove Road Office After

We installed new lighting, ceiling grid, carpets and deck boxes, decorations, heaters and electric shutters for the windows.
Grove Road Office After

The garage housed all of the plant but also the electrical DB, we needed to separate the two with a newly formed wall.
Grove Road Work Garage

This whole area was initially very damp and it was used to dry wet outdoor clothes and PPE. We installed more heaters and storage.
Grove Road Drying Room - After

Newly formed room within the garage to separate the plant and equipment from the stores and electrical DB.
Grove Road Workshop - After